Receipt Records and Discrepancies

Recording Tyre Sidewall, Wheel Mark, Valve Label or Delivery List Mismatches on Remote Projects

A practical record-keeping guide for remote project staff when visible tyre markings, labels or delivery documents do not match, without assigning blame or testing suspect parts.

What should a remote project record when the tyre sidewall, wheel mark, valve label or delivery list does not match?

When something does not match, record the visible facts only: order line reference, delivered quantity, tyre or component identity, sidewall and wheel marks, packaging condition, tube/flap/valve labels, photos, documents, and the exact observed difference. Keep the disputed item identifiable, separate observations from assumptions, and request written clarification from the responsible procurement or supply party. Do not ask site staff to mount, inflate, deflate, or test a suspect tyre.

1. Record the discrepancy as an observation, not a conclusion

A remote record should describe what is seen and what the documents state. It should not say who is wrong or whether the part is unacceptable.

Order line and delivered quantity

Record the purchase order line or requisition reference shown on the delivery note, the ordered description, the delivered quantity and the unit of measure. If the quantity is different, state only that the count is higher, lower or unmarked. Do not call it oversupply or short supply until the responsible party confirms it.

Tyre or component identity

Record the visible identity markings on each tyre or component: brand, size, pattern or model, load index, speed symbol, ply rating or other markings that are actually printed on the item. Write the characters as they appear, not as they should be. If a marking is worn, covered or absent, record that it is not readable.

Sidewall and wheel marks

Record all visible sidewall markings and wheel or rim markings. These may include part numbers, size, offset, bolt pattern, date codes, serial numbers or other stamped characters. Photograph each mark in context and close-up. Do not interpret a mark; copy it.

Tube, flap and valve labels

For tubes, flaps or valves, record any label text, printed size, part code, batch or lot number, valve type and pressure marking if present. If a label is missing or damaged, record that it is missing or damaged on receipt, not that the part is defective.

Packaging condition

Record the packaging condition: whether the wrapper, crate, banding, seal or label is open, closed, damaged, wet, marked or absent. Do not discard packaging until the responsible party confirms it is no longer needed.

Photos and document records

Take clear, date-stamped photographs of the delivery note, packing list, labels, sidewall, wheel marks, valve labels and packaging. Keep wide views and close-ups. Record document numbers, dates, revisions and any certificate references only if they are actually present on the supplied papers. A receipt photo, label or supplier statement is not proof of every claim.

2. Keep observations, assumptions and acceptance decisions separate

The record should contain three distinct layers: what was observed, what is not yet known, and what decision is requested from the responsible party.

What to state

Use phrases such as 'delivery note states X; sidewall states Y' or 'packing list quantity is 10; delivered count is 8 observed'. This keeps the record factual and checkable.

What not to state

Do not write that the tyre is wrong, non-compliant, unsafe, counterfeit or rejectable. Do not assign blame to the supplier, transporter or site staff. Do not state that the project has a legal right to reject or return goods; only responsible parties can decide acceptance using the applicable contract terms.

Disputed items must stay identifiable

Keep the disputed item with its original packaging, labels and delivery reference. Mark it as 'hold' or 'pending clarification' if site procedure allows. Do not mix it with accepted stock or send it away without written instruction.

3. Useful checks when documents or markings do not match

A remote project can perform document-based and visual checks without physical testing.

Compare only documents and visible markings

Lay out the delivery note, packing list and order line alongside the item. Compare one field at a time: part number, size, quantity, buyer reference, supplier reference and description. Record every field that matches and every field that does not.

Separate sample findings from batch acceptance

If only some items are checked, record the sample quantity, the identifying marks on the sampled items, and what was observed on those items. Do not extend a sample finding to the whole batch unless the responsible party directs that conclusion.

Record missing evidence separately

If a certificate, packing list page, drawing, specification or approval sheet is needed but not supplied, record it as 'not available to this project at receipt'. Do not guess its content.

4. Missing evidence and inaccessible sources

Some evidence is not available at a remote site. The record should say what was not seen and why.

Evidence that should not be assumed

Do not assume that a sidewall mark is correct because the supplier name is familiar. Do not assume that a valve label belongs to the tyre beside it. Do not assume that a smudged date code is a particular date. Only copy what is legible.

What to record if a source is not available

If the relevant contract, approved parts list, drawing, manufacturer bulletin, batch record or previous inspection report is not available to the project, record that the source was not accessible at the time of receipt. Do not invent standards, report numbers, pages, dates or test results.

5. Procurement next step

The purpose of the record is to give the responsible party enough information to decide.

Written clarification request

Send the observations and photographs to the responsible procurement, logistics or engineering party. Ask for written clarification on which information controls: the order, the delivery note, the packing list or the visible marking. Request confirmation of the correct part identity and quantity before further handling.

Hold disputed items without declaring rejection

State that the item remains on hold pending written instruction. Do not say it is rejected, returned, accepted or safe to use. Do not ask site staff to test the tyre by inflating it or by attempting a trial fit.

Refer physical handling to qualified professionals

Any inspection that involves moving a mounted assembly, removing packaging from a suspect tyre, checking a rim, or evaluating tyre condition should be referred to qualified tyre professionals. This record is a receipt and document control step only. It is not a mounting, demounting, inflation, deflation or pressure-testing instruction.